References
projekti


Here you will find our major deliveries, listed in chronological order.

2009:

  • Delivery of 320 tons of seamless pipes (material S355J2H, EN 10210-1,2; dimensions 42,4 − 323,9 mm)
  • Delivery of 50 tons of forged flanges according to ASME B16.5 (WN, SW, blind; material ASTM A350 - Grade LF2, ASTM A182 - Grade F316 and ASTM A105) for a reconstruction of the refineries abroad.
  • Delivery of 217 tons of welded pipes (dimensions 660,4 x 9,53 mm; 914,4 x 9,53 mm and 1067,00 x 9,53 mm) according to ASTM A672 - Grade C65 and C60 - Class 22, produced in compliance with NACE MR0175, for the reconstruction of a hydro cracking complex in a Refinery abroad.
  • Delivery of 60 tons of alloy steel seamless pipes (219,1 x 8,18 mm) according to ASTM A335 - P11.
  • Delivery of 8.600 m (434 tons) of welded pipes (273,1 x 323,9 x 6,4 and 7,1) according to API 5L Grade B for the gasification of Šabac.
  • Delivery of 50 tons of welding powder Lincoln Electric FX-780th

2008:

  • Delivery of 450 tons of seamless pipes as a raw material for export business (material St37.0; dimensions 193,7 x 7,1 mm).
  • Delivery of 400 tons of cold drawn and 300 tons of hot rolled steel bars (material C22E, C45E, 20Mn5 and 42CrMo4).
  • Delivery of 500 tons of plates, tubes, steel bars and other products for the production of 50 Simms type railway wagons.

2007:

  • Delivery of welded pipes according to API 5L specification (Grade X42, OD: 273,1 mm, WT: 5,2 mm, 5,6 mm and 6,4 mm) for gasification of the area Užice − Čajetina − Zlatibor. Quantity: 36.312 m (1.353 t).
  • Delivery of hot rolled and cold drawn steel bars (C22E, C45E, 20Mn5, 42CrMo4) Quantity: 947 tons.
  • Delivery of 46 forged flanges (dimension: Ø 1600 mm, material: P265GH) for the production of 10 heat exchangers (58 MW) for the Public Utility Company “Beogradske elektrane” (Belgrade Power Plants).
  • Delivery of forged flanges and tube sheets (material: 20Mn5V) and delivery of stainless steel seamless pipes (material: AISI 316L) for the production of a low pressure heater for the Power Plant “Nikola Tesla”.

2006:

  • Delivery of hot rolled and cold drawn steel bars (material: C22E, C45E, 20Mn5, 42CrMo4.
    Quantity: 912 tons.